Siding Complete

On Friday the 4th of September we were pleased to see the siding was complete, but nothing much more had been done this past week. The breaker box had two breakers installed, and a sticker had been posted heralding the arrival of the drywall stage. Otherwise, the interior looks the same as it did the week before. Houses on either side had the sidewalks poured and driveways paved. Two more houses to the left have started framing. By the time we move in every house on the block should be in process.

Click any picture to see a larger version, and use your browser’s back button to return to the gallery.

 

—Michael

 